Market

AI compute sets infrastructure requirements that existing facilities were not designed to meet

AI workloads are changing what infrastructure must deliver, and demand for capacity is growing faster than the ability to connect and build.

The need

  1. AI training and inference workloads require high power density, liquid cooling and continuous power supply — beyond the design of traditional colocation facilities.
  2. The bottleneck has shifted from servers to infrastructure: building a facility requires a suitable site, a grid connection, cooling, connectivity, capital and an anchor customer.
  3. In Israel, too, large-scale projects are being advanced that combine data center development with energy generation and storage.

Demand for capacity is growing faster than the ability to connect and build

Worldwide: capacity is expected to nearly double

Global data center capacity, in gigawatts (GW), according to JLL. 2025: ~103; 2030: ~200.
Data center electricity consumption, in terawatt-hours (TWh) per year, according to the IEA. 2024: 415; 2030: 945.

In Israel: connection demand far exceeds supply

~27,000 MW
Data center grid-connection requests submitted to Noga, the system operator
~1,500 MW
Capacity the electricity system has committed to connect so far
Up to 200 MW
Cap per new data center under the Electricity Authority framework

In the company's assessment, this gap is the opportunity: an advantage for those holding a site, a grid connection and a suitable design.

Sources: International Energy Agency (IEA), JLL, Israel Electricity Authority and Noga. The figures are forecasts and may change.